Enhancing Mining Operations with a Custom Man-Rider™ Winch
When a mine operator acquired an old mining site, it aimed to boost productivity by extending the existing mineshaft from 400 feet (122 meters) to 650 feet (183 meters). Transporting both personnel and equipment to this new depth presented unique challenges that required a specialized solution, to meet both quality and expertise.

